Time Required: A Long Weekend (Three days)
Difficulty: Depends on how much wood you have

With their current fixed dock rotting away, brothers Andrew and Kevin retreat to the drawing board eager to fix the situation and build their dream dock. They quickly come to the conclusion that their new floating dock will need to be self-propelled so that it can be moored both at the shore as well as in the middle of the lake where the swimming is prime.

Project Steps

Step 7

tips-for-working-with-your-bro-nap
ultimate-swim-raft-go-to-the-fish
ultimate-swim-raft-onboard-bbq

Enjoy a couple of tasty beverages on the water while watching the sunset.

Comments

The Ultimate Projects Guide

The individuals featured in this website are not professional builders and the build of the projects featured in this website are intended to be for your entertainment only. Nothing in this website should be construed as construction/building advice. Check your local building/safety codes and consult with a professional before starting any building project.